Influences of Earned Value Management on Construction Project's Performance in Yemen

dc.contributor.authorHakami, Waled
dc.contributor.authorShameri, M. A.
dc.contributor.authorAldhubhani, Belal R.
dc.date.accessioned2026-06-15T23:15:47Z
dc.date.issued2020
dc.description.abstractMost of projects in developing countries suffer cost overruns, behind the schedule, and bad quality due to improper monitoring and controlling technique. This study investigated the earned value management in Yemen as a monitoring and controlling technique and its relation with the project performance. The both qualitative and quantitative methods were adopted covering unstructured interview and questionnaire. This study conducted both pilot study and pre-test which led to proper instrument used in large-scale survey. Reliability and validity tests applied on the instrument which judged it to be reliable and valid. SPSS IBM 19 analysed the data showing that the Earned value has not understood due to lack of knowledge and wasn�t practiced in the site. Consequently, this led to performance failure. To overcome this issue, the academics and practitioners should study and practice earned value management in Yemen particularly, and in developing countries in general.en_US
dc.identifier10.35940/ijitee.K7816.1091220
dc.identifier.citationHakami, W., Shameri, M. A., & Aldhubhani, B. R. (2020). Influences of Earned Value Management on Construction Project's Performance in Yemen. International Journal of Innovative Technology and Exploring Engineering, 9(12), 64-70. https://doi.org/10.35940/ijitee.K7816.1091220en_US
dc.identifier.urihttps://repository.ust.edu.ye/handle/123456789/419
dc.identifier.urihttp://ijitee.org/portfolio-item/K78160991120/
dc.language.isoen
dc.publisherBlue Eyes Intelligence Engineering and Sciences Publicationen_US
dc.titleInfluences of Earned Value Management on Construction Project's Performance in Yemenen_US
dc.typeArticleen_US

ملفات